Innovative First-Floor Extension in Hampton East, Victoria

About The Project

Blue Point Building recently completed a stunning first-floor extension and walk-in pantry in a Hampton East home.

The Objective

Al and Fiona needed a 4th bedroom and a larger pantry space. Their Hampton East home required a first-floor addition to accommodate a new master bedroom, walk-in robe, ensuite, and lounge room, alongside converting an old ensuite into a spacious walk-in pantry. The goal was to expand their living space upwards, integrating functionality with elegant design.

Clients Names

Al & Fiona

Location

Hampton East

Duration

8 Months

Our Approach

Understanding Client Needs

Right from the start, we focused on truly understanding what Al and Fiona envisioned for their home. They had clear ideas, so our first step was to provide an accurate estimate of costs. We then moved on to creating detailed plans, engineering assessments, and securing the necessary building permit.

Collaborative Design and Planning

Jess, our talented draftsman, took the lead in layout and design, ensuring that every space was optimally utilised. We worked closely to handle the engineering challenges, particularly those involving steelwork, ensuring that our solutions were both effective and cost-efficient.

Execution with Precision

Once we secured the building permit, our team eagerly got to work. We started with detailed demolition work and then built a solid foundation for the new structures. We skillfully installed steel columns and beams, a task demanding precision and careful planning. Throughout the project, we actively paid close attention to every detail, from setting up scaffolding and framing to reaching the lock-up and fit-off stages. We also creatively redesigned the old study to include the new stairs and laid down fresh floorboards, making sure every new element blended seamlessly with the existing structure.

The Challenges

Battling the Winter Weather

Winter in Hampton East posed the biggest challenge. As we extended the house upwards during the colder, wetter months, we faced unique difficulties, especially during the framing, roofing, and cladding stages. However, we were well-prepared for these challenges. Additionally, we utilised specialised equipment and protective measures to combat the cold temperatures and strong winds, allowing us to carry out the construction smoothly and efficiently.

Lock-Up Before Spring

Despite the winter weather’s challenges, our strategic planning and proactive measures helped us reach the lock-up stage before spring. This milestone was vital, protecting the extension’s interior from the elements and letting us focus on the internal build without interruptions from the weather.

The Solutions

Comprehensive Planning and Engineering

Our journey began with an exhaustive planning phase. We carefully developed the plans, ensuring every aspect of the new design was in harmony with Al and Fiona’s vision. The engineering challenges were significant, especially considering the addition of a second storey. Our team carefully calculated the structural requirements, integrating steel posts and beams that would not only support the new construction but also blend seamlessly with the existing structure.

Interior and Finishing Touches

The interior phase was where the project truly came to life. We seamlessly integrated new stairs into the former study area. Our focus on detail continued with the installation of new floorboards, ensuring a cohesive flow throughout the house. The finishing team worked diligently, paying close attention to the nuances that would unify the aesthetic and functional aspects of the project.

Realising the Client's Vision

Throughout the process, our aim was to actualise Al and Fiona’s vision for their home. We customised every design element, from the spacious and modern master bedroom tothe well-designed walk-in pantry, to align with Al and Fiona’s preferences. The final outcome was more than just a new space; it was a transformation of their home, mirroring the unique character and lifestyle of its owners.

Building from Ground Up

Despite the winter weather’s challenges, our strategic planning and proactive measures helped us reach the lock-up stage before spring. This milestone was vital, protecting the extension’s interior from the elements and letting us focus on the internal build without interruptions from the weather.

Attention to Detail in Construction

Our focus shifted to bringing the vision to life with the structure in place. The framing process was a testament to our craftsmanship, creating the stage of what was to become a beautiful new living space. We reached the lock-up stage efficiently, making the site weather-proof and secure. This was important, especially considering the challenging winter conditions.

Final Thoughts

Reflecting on the project, we realise that an earlier start in Spring might have eased the challenges of winter. However, the achievements of the project are notably impressive. The precision in our engineering and the strategic placement of steel posts were key successes. Chris’s exceptional work, especially under challenging conditions, played a vital role in bringing the project to life. The transformation, evident in the before and after photos, is both awe-inspiring and gratifying. It underscores our commitment to quality workmanship and our capability to achieve remarkable outcomes, regardless of the obstacles encountered.